Location: United States ChangeClose

Resources - 30 Results - Clear filters

Case Studies

Smart Meter Rollout in France

When ENEDIS set out to meet the European council directive of smartening 80% of their meters by 2020, they decided to go beyond basic requirements and equip France for the energy challenges of the future.

Unlock
Case Studies

Tauron consolidates smart meter readings with Landis+Gyr Converge

When Poland’s largest Distribution System Operator, TAURON Dystrybucja, serving over 49.9 TWh of electricity annually, faced new regulations for grid maintenance and an explosion of photovoltaic installations from their customers, they needed to adapt their metering infrastructure to serve their…

Unlock
Case Studies

Managed Services for Third Party Devices Case

The comprehensive Metering as a Service -solution offered by Landis+Gyr comprises the entire residential AMI infrastructure of Caruna, making it their largest Managed Services project in the Nordics. The scope of the MaaS (Metering as a Service) covers hourly consumption…

Download
Case Studies

SMART Metering Rollout in the Heart of Europe

Landis+Gyr was the supplier of choice for a country-wide rollout in the principality of Liechtenstein. Landis+Gyr delivered a comprehensive smart metering solution covering the entire European principality of Liechtenstein. The publicly owned utility Liechtensteinische Kraftwerke (LKW), the sole supplier of…

Unlock