Page 5 - Landis+Gyr | pathway 05
P. 5
170 million 145 million 125 million 100 million smart meters 2016 2017 2018 2019 23 September 2009 12 October 2009 1 March 2011 December 2012 The Interoperable Device Interface First phase of M/441: Final report Mandate M/490: “Smart Grid Mandate Second phase of M/441: Report by Specifications (IDIS) Industry of the Smart Meters Coordination – Standardization Mandate to ESOs the Smart Meters Coordination Group Association is founded in Zug, Group “Standardization mandate to to support European Smart Grid “Introduction and Guide to the work Switzerland, as a private initiative CEN, CENELEC and ETSI in the field deployment”. undertaken under the M/441 mandate”. of three smart metering companies of measuring instruments for the (Landis+Gyr, Iskraemeco and Itron). development of an open architecture for “The objective of this mandate is to The second phase invites the ESOs (see page 26) utility meters involving communication develop or update a set of consistent to identify the functionalities and protocols enabling interoperability”. standards within a common European interfaces that the communication framework […] that will achieve standards should address. The first phase of M/441 requests interoperability and will enable or the ESOs to identify the main facilitate the implementation in Europe possible functional communication of […] Smart Grid services and implementations relevant for smart functionalities […]”. metering systems and the standards relevant to meet these requirements.
   1   2   3   4   5   6   7   8   9   10