Location: United States ChangeClose

Controller FPS

FPS functionality and hardware, control of several FPS Local Units with FPS Central Unit, host connection
(IEC 60870-5-104), load control, load regulation (e.g. proposed value program), logs, diagnostics and fault/failure handling, auxiliary equipment, duplex computer configuration (redundancy).

Duration

2 days

Price

on request

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close